
Drive-In Loading Ramp
Dockzilla’s Drive-In Loading Ramps retrofit elevated dock doors so that vehicles can drive into a building. These prefabricated loading dock ramps can be used for a variety of purposes, including order fulfillment operations inside a facility.
View SpecsSPECIFICATIONS
- 30’ to 80’ long available
- 8’, 9’-6” and 11’-6” standard CLEAR widths
- Tall 13” solid side curbs
STOCK SIZES
- 30’ long x 96” clear (102” outside)
- 50’ long x 11’-6” clear (142” outside)
- 16,000 lb. capacity
- 5 Year Structural Warranty
OPTIONAL FEATURES
- Full length handrails
- 16,000 lb., 22,000 lb., 32,000 lb. Capacities
- Weather Shelters
- Traction Grating
- Custom sizes engineered to order

Our drive-in ramps transform any warehouse into a distribution facility in a fraction of the time it takes for conventional ramp construction. These two-piece loading dock ramps are engineered in expanded sizes to accommodate wider clear widths and more substantial lengths needed. Additional safety features are available such as full-length handrails, as well as weather shelters and expanded traction grating for operations that experience inclement weather.
Transform Any Warehouse
- Fastest way to get vehicles into building
- Prefabricated for easy installation
- Removable when needed
- No need for conventional construction
- Expanded widths and lengths
Modular Retrofit That’s Removable


Safety
Includes handrails and sidecurbs, with optional full-length handrails available.

Durable
Prefabricated high strength steel design with 5-year structural warranty.

Fast
Installed in a day with increased productivity in loading operations.

Versatile
Available in expanded clear widths and lengths to accommodate any application.
“When our business unit needed to re-locate on short notice, and the destination facility had no dock access ramp, we needed an affordable, reliable and fast solution. Enter Dockzilla and their helpful, friendly staff. After filling out the self-explanatory Site Survey and receiving a quote, our 2-piece ramp arrived about six weeks later.
We were impressed with the structural integrity and overall construction. Installation and setup was straightforward – taking about three hours from start to finish. Now, almost one year later – the ramp is performing flawlessly. Despite being exposed to the elements, the finish is holding up well and the ramp still looks as good as the day it was installed.”
– Yasha Neparko, Engineering Team Leader, Holley
GET MORE INFO
Stop shopping and talk to a real engineer who understands what goes down at the loading dock.