Case Studies - Dockzilla
Case Studies Header

Dockzilla solves “unsolvable” loading challenges.

Click around to read real-world examples of how we’ve helped businesses achieve their goals lightyears faster than traditional construction.

Dockzilla Cross Dock Port

ADD STEVEDORING CROSS DOCK IN A PINCH

Dockzilla rapidly deployed a 24-position covered cross dock at Port Freeport, Texas, providing a stevedoring company with the urgent capacity needed to handle incoming shipments while a permanent construction project was delayed.

View Case Study
default

EXPAND DIRECT DELIVERY WITHOUT BRICK-AND-MORTAR

Dockzilla’s Mobile Cross Dock solutions empowered a major grocery chain to expand same-day delivery services, making rapid order fulfillment possible without the need for long-term real estate investments.

View Case Study
dockzilla yusen main img

STAND UP TRANSLOADING HUB AT PORT FOR GLOBAL 3PL

Dockzilla rapidly constructed a custom transloading hub at the Port of Charleston for a global third-party logistics provider, allowing the swift transfer of goods from overseas containers to trailers and mitigating supply chain congestion.

View Case Study
Aerial photo of Dock Houses and exterior dock levelers

DRIVE SUSTAINABILITY & SAVINGS AT LEASED FACILITIES WITH DOCK HOUSE

Dockzilla’s Dock House Exterior Levelers retrofitted a leased warehouse, improving energy efficiency by eliminating pit-style levelers and reducing energy loss.

View Case Study
case study amazon image

REDUCE CYCLE TIME WITH ULTRA-EFFICIENT DRIVE RAMP

Dockzilla’s multi-lane drive ramp and elevated loading platform at a global e-commerce warehouse eliminated manual handling and reduced cycle times by allowing direct loading of last-mile vehicles, accommodating 20 vehicles simultaneously.

View Case Study
Dockzilla Distribution Warehouse Temporary Loading Docks

CONVERT PARKING LOT TO TEMPORARY SHIPPING & RECEIVING WAREHOUSE

The University of Rochester hired Dockzilla to design & stand up a 3,840 sq. ft. temporary shipping & receiving warehouse on an irregular asphalt lot, enabling uninterrupted operations during a multi-year construction project.

View Case Study
DJI

TACKLE MID-MILE DELIVERY DURING PEAK SEASON

During peak holiday season, Dockzilla rapidly deployed a custom 15,000 sq. ft. cross-dock with 16 loading positions on a vacant lot in hurricane-prone Tampa, Florida, enabling a major e-commerce company to overcome mid-mile delivery challenges.

View Case Study
DZ_Drone_epstein-02

MAINTAIN COLD SHIPPING OPERATIONS DURING CONSTRUCTION

Wholestone Farms hired Dockzilla to engineer and install a temporary 7,376 sq. ft. refrigerated modular building to maintain cold storage operations during a three-year warehouse renovation at their Fremont, NE plant.

View Case Study

LET’S GET YOU LOADING

Talk to a real engineer who understands what goes down at the loading dock.

Request More Info