Dockzilla solves “unsolvable” loading challenges.
Click around to read real-world examples of how we’ve helped businesses achieve their goals lightyears faster than traditional construction.

REDUCE CONGESTION WITH DISTRIBUTION HUB
Dockzilla’s modular distribution hub in Breckenridge, Colorado, alleviated downtown congestion by receiving deliveries outside of town and using electric vehicles for final delivery to businesses.
View Case Study
ADD STEVEDORING CROSS DOCK IN A PINCH
Dockzilla rapidly deployed a 24-position covered cross dock at Port Freeport, Texas, providing a stevedoring company with the urgent capacity needed to handle incoming shipments while a permanent construction project was delayed.
View Case Study
EXPAND DIRECT DELIVERY WITHOUT BRICK-AND-MORTAR
Dockzilla’s Mobile Cross Dock solutions empowered a major grocery chain to expand same-day delivery services, making rapid order fulfillment possible without the need for long-term real estate investments.
View Case Study
STAND UP TRANSLOADING HUB AT PORT FOR GLOBAL 3PL
Dockzilla rapidly constructed a custom transloading hub at the Port of Charleston for a global third-party logistics provider, allowing the swift transfer of goods from overseas containers to trailers and mitigating supply chain congestion.
View Case Study
DRIVE SUSTAINABILITY & SAVINGS AT LEASED FACILITIES WITH DOCK HOUSE
Dockzilla’s Dock House Exterior Levelers retrofitted a leased warehouse, improving energy efficiency by eliminating pit-style levelers and reducing energy loss.
View Case Study
REDUCE CYCLE TIME WITH ULTRA-EFFICIENT DRIVE RAMP
Dockzilla’s multi-lane drive ramp and elevated loading platform at a global e-commerce warehouse eliminated manual handling and reduced cycle times by allowing direct loading of last-mile vehicles, accommodating 20 vehicles simultaneously.
View Case Study
CONVERT PARKING LOT TO TEMPORARY SHIPPING & RECEIVING WAREHOUSE
The University of Rochester hired Dockzilla to design & stand up a 3,840 sq. ft. temporary shipping & receiving warehouse on an irregular asphalt lot, enabling uninterrupted operations during a multi-year construction project.
View Case Study
TACKLE MID-MILE DELIVERY DURING PEAK SEASON
During peak holiday season, Dockzilla rapidly deployed a custom 15,000 sq. ft. cross-dock with 16 loading positions on a vacant lot in hurricane-prone Tampa, Florida, enabling a major e-commerce company to overcome mid-mile delivery challenges.
View Case Study
MAINTAIN COLD SHIPPING OPERATIONS DURING CONSTRUCTION
Wholestone Farms hired Dockzilla to engineer and install a temporary 7,376 sq. ft. refrigerated modular building to maintain cold storage operations during a three-year warehouse renovation at their Fremont, NE plant.
View Case StudyLET’S GET YOU LOADING